
Complete
Barnes House
396 m²Full renovation42 m² extension
The brief
Barnes House was a complete 396 m² renovation carried out over eight months. The house was given a new roof, a 42 m² extension and double glazing works to the swimming pool, and the interior was reconfigured from the structure up and finished throughout.
- Replacement of a four pitched roof across the whole property.
- A 42 m² extension creating a new gym area.
- Double glazing works to the swimming pool, plus new windows and bifolds.
- Load bearing walls removed and the load supported for a full reconfiguration of the interior rooms.
- Re-plumbing, skimming and painting throughout.
- Carpentry work including wall and ceiling panelling.
- New floors installed with self levelling below, plus bathroom installations.
396 m²Floor area
42 m²Extension
New roofRoof
Double glazingSwimming pool
CompleteStatus
The gallery
Every room, finished.
Planning something similar?
Send us the drawings and we will price it properly — one contractor, fixed programme, itemised quote.
Start a project →