Penton Court, completed project by Lamont Builds
Lamont Builds

Builders in Chiswick

Bedford Park to Grove Park — building inside London's first garden suburb.

Arrange a site visit →

Chiswick runs from the quietest garden suburb in London to the river at Grove Park. Bedford Park — the first garden suburb, laid out in the 1870s — has a strict Article 4 direction and some of the most watched street elevations in West London; the Glebe Estate terraces and the Turnham Green streets bring the usual Victorian extension work; and Grove Park adds riverside consents and flood considerations. Our full renovations around here typically combine structural work with a high standard of finish.

Underneath it all is Hounslow's planning regime — less famous than its neighbours' but with its own expectations, especially in the conservation areas. We design to Hounslow's planning requirements from the start, and because we work the neighbouring Hammersmith and Barnes patches too, the whole arc of the river is our working territory.

Bedford Park: a constraint we enjoy

Bedford Park was designed to be looked at, and 150 years later it still is. The Article 4 direction means alterations that are normally permitted development — dormers, extensions, even windows — need consent, and the residents' association comments on applications with real knowledge. We design within the suburb's own grammar: matching materials, honest rooflines, and interiors that are free where it counts.

Rear extensions and side returns off Turnham Green

The terraces around Turnham Green and the Glebe Estate carry the classic West London extension work — side returns, kitchen diners and wraparounds, with the party wall and drainage handled in-house. Chiswick plots are often a little deeper than Fulham's, which gives the rear extensions room to breathe; the design question is usually how the glazing meets the garden.

Grove Park and the riverside

Grove Park brings riverside houses where flood-risk assessments, drainage conditions and TPOs feature on most consents. Renovations here tend to be whole-house: services, reconfiguration, gardens and finishing — our design and build model, with the interiors carried in the same contract as the structure.

Our work

Projects close to here.

Related

Questions

Answers, before you ask.

Can I alter a Bedford Park house?

Yes, with consent. The Article 4 direction brings most alterations under planning control, and the design needs to match the suburb's materials and detailing. It is a genuinely navigable process — we design for it routinely.

Is Chiswick mostly extensions or full renovations?

Both: side returns and rear extensions on the terraces, whole-house renovations in Bedford Park and Grove Park — often combined into one phased programme.

Who handles planning in W4?

Hounslow Council. We prepare and run the applications, including the conservation-area statements, as part of the build.

Do you work near the river in Grove Park?

Yes — flood-risk and drainage conditions are part of our standard consent work there, and we design floor levels and drainage around them from the start.

How long does a typical Chiswick project take?

A rear and side return extension runs around three to four months on site; full renovations longer. You get a fixed programme with staged dates before work starts.

Planning a project?

Send us the drawings and we will price it properly — one contractor, fixed programme, itemised quote.

Start a project →