Barnes House, full renovation and rear extension by Lamont Builds
Lamont Builds

Builders in St John's Wood

Detached villas, Avenue Road and the Eyre Estate — basements and rebuilds behind retained facades.

Arrange a site visit →

St John's Wood is detached-villa territory: substantial houses on the Eyre Estate and the streets around it, with Avenue Road holding some of the most valuable residential plots in the country. The work here is bigger than renovation — basements under the houses, extensions behind the facades, and where the plot and the economics align, complete rebuilds behind retained elevations. All under Westminster policy, with listed and conservation constraints on much of the stock.

Our NW8 projects run as full design and build programmes: the consent strategy, the engineering and the build under one contract, with the finish carried by our in-house interiors team. Neighbouring Marylebone and Hampstead share the same approach on their streets.

Basements on generous plots

The villas have the gardens and the separation that make basement schemes viable where terraces struggle. Westminster's basement policy still governs — no harm to neighbours, structure or trees, construction management plan included — but the detached stock carries consentable schemes more often than most of the borough. We design the dig, the waterproofing and the lightwells as an engineering package first: see how we run basement conversions.

Rebuilds behind retained facades

On some NW8 plots the honest answer is a new house. Where conservation or streetscape policy requires the front elevation to remain, we take the facade down carefully, support it, and build the new house behind it — foundations to finishes, engineered and signed off, with the streetscape preserved and the inside entirely new. It is the most demanding project type we run, and the reason the design and build model exists.

The villas and the finish

Between the extremes, the ordinary NW8 project is an extraordinary one by any other measure: full refurbishment, services renewal, extension and a specification — joinery, stone, engineering — that matches the house. Westminster's planning service governs the consents, and our programme carries them.

Our work

Projects close to here.

Related

Questions

Answers, before you ask.

What is a retained-facade rebuild?

Demolishing the house behind its front elevation — which stays supported in place while a new structure is built behind it. It is used where the streetscape is protected and the existing house has no economic life left.

Are basements easier on detached NW8 houses?

Generally yes — separation from neighbours simplifies the party wall and overlooking issues, though Westminster's policy conditions still apply in full.

How long do these projects run?

Facade-retention rebuilds and large basement schemes run twelve months and up; full refurbishments several months. The programme is fixed before works start, with staged dates.

Does the Eyre Estate need to consent works?

The estate holds consent rights over many of its streets — we confirm the position for your specific house and run the licence alongside Westminster's consents.

Do you handle the whole thing or just the build?

The whole thing — consents, engineering, demolition, build and interiors as one design and build contract, one point of contact.

Planning a project?

Send us the drawings and we will price it properly — one contractor, fixed programme, itemised quote.

Start a project →